TERAWATT WORKSHOP 2021

Lifetime Analysis of Electrification Futures BASE Installations with RELIABILITY APPROACHES: PV ICE, modifying lifetime (t50, t90, ProjecT) and Degradation

Simulation 1: Regular PV ICE

LIFETIMES

RELIABILITY MESS

Variables modified on each case:

  • Case1 -- r4 : mod_lifetime, mod_reliability_t50, mod_reliability_t90

  • Case2 -- r5: mod_lifetime, mod_reliability_t50, mod_reliability_t90, mod_degradation

  • Case3 -- r6: mod_degradation

  • Run Simulations

    Creating Summary of results

    Converting to grams to METRIC Tons.

    Adding NEW Installed Capacity to US

    Creating Cuulatives

    Adding Installed Capacity to US

    Reindexing

    Mining Capacity

    PLOTTING GALORE

    Waste_ EOL

    Waste_ EOL + MFG

    BIFACIAL PROJECTION COMPARISON

    Installed Capacity

    SAVE RESULTS OPENEI

    @scenario @ timeseries @ value|VirginMateiralDemand|Glass#MEtric Tonnes ........ PVV_ICE 2020 PV_ICE 2030

    WEIBULL PLOTS

    TABLES

    Bonus: Bifacial Trend Cumulative Virgin Needs (not plotted, just values)

    Waste by year